921 Howard Street, San Francisco
- Plans and specs ground-up construction
- 18 stories, 203 affordable units in SOMA
- Two community rooms, two outdoor terraces, indoor bike parking, and a community-serving ground-floor space
- Fire Alarm System, security system, low voltage, fan system, 2-way comm, telephone wiring, data wiring, smoke control, all power wiring
531 Bryant Street, San Francisco
- Design Build ground-up construction, core and shell
- Six stories including restaurant, hospitality lounge, garden courtyard, office space, and rooftop garden
- Basic lighting, new fire alarm system, ERRCS system, outdoor lighting for rooftop patio, and security system
- Micro-retail spaces for potential offices
- South Park’s first “trophy office” designed for health, wellness, and sustainability
University of San Francisco Basketball Practice Facility
Malloy Pavilion
- Plans and specs ground-up construction
- USF Basketball Practice Facility
- Site Lighting and Electrical 12kv service
- Electrical main service work, electrical distribution complete, lighting and lighting controls, life safety complete, 2-way comm system, low voltage work, security system, access control
- Broadcast quality TV lighting
Ambassador Hotel, San Francisco
- Plans and specs, seismic retrofit
- Rehabilitation of a historic, unreinforced masonry building in the Tenderloin neighborhood of San Francisco
- Electrical upgrades to 134 units including 14 ADA units (exhaust fans, smoke detectors, light fixtures, etc.)
- Building Access System Replacement, Close Circuit Security Television System, Wi-Fi Access Point and Infrastructure, Fire Alarm
- Provided temporary Fire Alarm protection while under construction
- Site Lighting, Power for Façade Maintenance System, Exterior Street Level Security Lighting, Roof Conduit Re-Support
- Low voltage work, 2-way comm system, electrical work for elevator upgrade/replacement
- Completed while building was occupied
Yosemite Apartments, San Francisco
- Plans and specs remodel and seismic
- Renovation of 32-units and all common spaces serving low-income individuals and families
- Housing: 19,374 square feet, Commercial: 900 square feet
- Low voltage work, Fire Alarm, generator, switchgear, wi-fi infrastructure, 2-way comm, underground electrical, replaced rooftop convenience receptacles/added new receptacles, building access systems
San Francisco VA - Federal Project
Building 22 and 203
- Plans and specs remodel
- Electrical upgrades to Building 22 and Building 203
- Building 22 work: Demo on the 2nd floor and roof. Provided elevator power upgrades, installed lighting and lighting controls, mechanical connections, AV and structured cabling, power/receptacles, Fire Alarm system, low voltage work, testing and upgrades to fiber pathways
- Building 203 work: Removed power for demo, installed lighting and lighting controls, mechanical connections, Fire Alarm and security systems, low voltage work
Design Build Projects
- SFUSD, Mission Bay Elementary School
- Transbay Block 2, Multi Unit Bldg
- 531 Bryant, Office Bldg
- 1066 Market St, Multi Unit Bldg
- 531 Geary St, Multi Unit Bldg
-
Candlestick Cove, Multi Unit Bldg
-
3575 Geary Blvd. Multi Unit Bldg
-
923 Folsom St. Multi Unit Bldg
-
1400 Mission St, Multi Unit Bldg
-
Transbay Block 7, Multi Unit Bldg
-
1395 22nd St, Multi Unit Bldg