Projects

921 Howard Street, San Francisco

  • Plans and specs ground-up construction
  • 18 stories, 203 affordable units in SOMA
  • Two community rooms, two outdoor terraces, indoor bike parking, and a community-serving ground-floor space
  • Fire Alarm System, security system, low voltage, fan system, 2-way comm, telephone wiring, data wiring, smoke control, all power wiring

531 Bryant Street, San Francisco

  • Design Build ground-up construction, core and shell
  • Six stories including restaurant, hospitality lounge, garden courtyard, office space, and rooftop garden
  • Basic lighting, new fire alarm system, ERRCS system, outdoor lighting for rooftop patio, and security system
  • Micro-retail spaces for potential offices
  • South Park’s first “trophy office” designed for health, wellness, and sustainability

1066 Market Street, San Francisco

  • Design Build ground-up construction
  • 16-story high rise with 4 levels of garage and 305 units
  • Electrical, fire alarm, generator, low voltage work
  • Market-rate apartments inspired by the rich historical and social significance of the Mid-Market area

University of San Francisco Basketball Practice Facility

Malloy Pavilion
  • Plans and specs ground-up construction
  • USF Basketball Practice Facility
  • Site Lighting and Electrical 12kv service
  • Electrical main service work, electrical distribution complete, lighting and lighting controls, life safety complete, 2-way comm system, low voltage work, security system, access control
  • Broadcast quality TV lighting

Aldersly Rosenborg Retirement Home,
San Rafael

  • Plans and specs remodel of 30 units and partial garage
  • Installed circadian lighting system, fire alarm system, emergency lighting and power, low voltage, security system
  • Retirement community in San Rafael

Ambassador Hotel, San Francisco

  • Plans and specs, seismic retrofit
  • Rehabilitation of a historic, unreinforced masonry building in the Tenderloin neighborhood of San Francisco
  • Electrical upgrades to 134 units including 14 ADA units (exhaust fans, smoke detectors, light fixtures, etc.)
  • Building Access System Replacement, Close Circuit Security Television System, Wi-Fi Access Point and Infrastructure, Fire Alarm
  • Provided temporary Fire Alarm protection while under construction
  • Site Lighting, Power for Façade Maintenance System, Exterior Street Level Security Lighting, Roof Conduit Re-Support
  • Low voltage work, 2-way comm system, electrical work for elevator upgrade/replacement
  • Completed while building was occupied

Yosemite Apartments, San Francisco

  • Plans and specs remodel and seismic
  • Renovation of 32-units and all common spaces serving low-income individuals and families
  • Housing: 19,374 square feet, Commercial: 900 square feet
  • Low voltage work, Fire Alarm, generator, switchgear, wi-fi infrastructure, 2-way comm, underground electrical, replaced rooftop convenience receptacles/added new receptacles, building access systems
Building 22
Building 203

San Francisco VA - Federal Project

Building 22 and 203
  • Plans and specs remodel
  • Electrical upgrades to Building 22 and Building 203
  • Building 22 work: Demo on the 2nd floor and roof. Provided elevator power upgrades, installed lighting and lighting controls, mechanical connections, AV and structured cabling, power/receptacles, Fire Alarm system, low voltage work, testing and upgrades to fiber pathways
  • Building 203 work: Removed power for demo, installed lighting and lighting controls, mechanical connections, Fire Alarm and security systems, low voltage work

Fairmont Hotel, San Francisco

  • Update power and distribution
  • Office remodel
  • Partial room remodel

PG&E General Office Complex
San Francisco

  • Installation of six emergency generators
  • Data center, new UPS & distribution
  • Facility-wide ATS replacement project
  • AHU Replacement project
  • TI's on 2 floors simultaneously (50,000 sqft)

San Francisco General Hospital

  • Electrical upgrades and additions throughout the facility

Boudin Sourdough Bakery & Cafe

  • Ground up new construction, bakery and restaurant/gift shop

990 Polk St. Senior Housing

  • Ground up new construction, multi unit building with retail

CPMC Hospital

  • Clinic upgrades
  • X-ray room upgrades
  • Nurse call
  • Life Safety Systems

Westin St. Francis

  • Remodel of new wing and conference centers

Laguna Honda Hospital and Rehabilitation Center

  • Fire alarm install
  • Grounds lighting
  • Interior and exterior lighting upgrades

USF Lone Mount Science Center

  • Ground up new construction, science center

3575 Geary Blvd. Institute on Aging

  • Multi unit building with clinic

Park Central Hotel

  • Remodel of guest rooms and public/amenities

345 California Center

  • Full Fire Life Safety System replacement, fully occupied offices and hotel

Marriott Downtown and Fisherman's Wharf

  • Complete room remodel and fire alarm

101 Lombard

  • Full Fire Life Safety System replacement, fully occupied residential complex

Parc 55 Hotel

  • Room remodel and public spaces with amenities
  • Full Fire Life Safety System replacement

Palace Hotel

  • Complete room remodel

Design Build Projects

  • SFUSD, Mission Bay Elementary School
  • Transbay Block 2, Multi Unit Bldg
  • 531 Bryant, Office Bldg
  • 1066 Market St, Multi Unit Bldg
  • 531 Geary St, Multi Unit Bldg
  • Candlestick Cove, Multi Unit Bldg
  • 3575 Geary Blvd. Multi Unit Bldg
  • 923 Folsom St. Multi Unit Bldg
  • 1400 Mission St, Multi Unit Bldg
  • Transbay Block 7, Multi Unit Bldg
  • 1395 22nd St, Multi Unit Bldg